Safety Checklist

My day Omar Mukhtar bin ZainalMV-712664
Omar Mukhtar bin Zainal No Known Allergy Right (OD)
49y · M · MV-712664 · Intravitreal Injection · OD
Theatre
Injection room · 11.32 AM
Status
Awaiting Call
ASA
3

WHO checklist

7/35
Check Answer
Sign-In · Sign-In Before induction · Surgeon (topical), Coordinator Nurse
6/15
Confirmed patient name, planned procedure, site-side, consent
From recordConsent signed and locked
Op site marked
IOL model + power confirmed against biometry
Sterile set
GA machine checked
Anaesthetic machine, oxygen, suction and monitors checked by the anaesthetist
Pulse oximeter on and functioning
Patient has allergy
From record
Difficult airway or aspiration risk
Any GXM or GSH
Venous cannulation done
Hypothermia risk > 1 h
VTE prophylaxis
Suction apparatus checked and functioning
OT table checked and functioning
Swab count Sign-In opens when the case is Checked In (now Awaiting Call)

Stages

Sign-In
6/15 · opens at Checked In
Check-In
0/1 · opens at Awaiting Procedure
Time-Out
1/10 · opens at Awaiting Procedure
Intra-Op
0/3 · opens at Procedure In Progress
Sign-Out
0/6 · opens at Procedure In Progress

Signatures

0
Sign-In · Surgeon (topical)
Dr. Seow Shu Yee · not signed
Sign-In · Coordinator Nurse
Khairul Azmi bin Mahmud · not signed
Check-In · Surgeon
Dr. Seow Shu Yee · not signed
Time-Out · Surgeon
Dr. Seow Shu Yee · not signed
Time-Out · Surgeon (topical)
Dr. Seow Shu Yee · not signed
Time-Out · Scrub Nurse
Yap Swee Mei · not signed
Intra-Op · Scrub Nurse
Yap Swee Mei · not signed
Sign-Out · Checklist Coordinator
Khairul Azmi bin Mahmud · not signed